中科攪拌機兩種校準螺旋電子秤的方法
中科攪拌機皮帶秤的校準方法:將速度控制器上的“自動/手動”開關調到手動位置,將速度調到小電位計,打開主機和速度控制器的電源。15分鐘后,啟動皮帶秤,調節速度控制器上的速度,讓電位計使皮帶運行(400-500 RPM),根據需要測試零點。按F3將光標移動到待校準的K值前面,再按F5將一些沙袋放在已知重量(累計重量> 100KG)的跑步帶上。
Calibration method of Zhongke mixer belt scale: adjust the "automatic / manual" switch on the speed controller to the manual position, adjust the speed to the small potentiometer, and turn on the power supply of the host and speed controller. After 15 minutes, start the belt scale, adjust the speed on the speed controller, let the potentiometer run the belt (400-500 RPM), and test the zero point as required. Press F3 to move the cursor to the K value to be calibrated, and press F5 to place some sandbags on the running belt with known weight (cumulative weight > 100KG).
此時,以流的形式顯示重量或沙袋的累積值,然后將重量或沙袋的重量發送給K值。道路的K值由微機決定。計算新的K值,以同樣的方式校準2-3次,直到累積流量等于實際流量。其他道路標記方法與上述方法相同。
At this point, the weight or the accumulated value of the sandbag is displayed as a stream, and then the weight or the weight of the sandbag is sent to the K value. The K value of the road is determined by the computer. Calculate the new K value and calibrate 2-3 times in the same way until the cumulative flow equals the actual flow. Other road marking methods are the same as above.
螺旋電子秤的校準方式有兩種:將速度控制器上的“自動/手動”開關置于手動位置,將給定電位計的速度調節到較小的速度,啟動螺旋電子秤。先將水泥內部清洗干凈,然后按零位測量法進行零位測量。按F3將光標移動到第7個K值的前面,按F5調整給料機控制的速度,使電位器旋鈕可以取下。同時擰緊螺絲和電子秤,使其在出口處排出。水是穩定的。攪拌站攪拌帶完成后,按回車鍵,將物料的實際重量發送到K值。按Enter確認。這是K值自動生成一個新的K值的地方,以同樣的方式校準。完成校正工作,直累積重量等于實際重量為止。
There are two ways to calibrate the screw scale: set the "auto / manual" switch on the speed controller to the manual position, adjust the speed of the given potentiometer to a smaller speed, and start the screw scale. First, clean the inside of the cement, and then measure the zero position according to the zero position measurement method. Press F3 to move the cursor to the front of the 7th K value, and press F5 to adjust the speed of feeder control so that the potentiometer knob can be removed. At the same time, tighten the screws and the scale to make it discharge at the outlet. Water is stable. After the mixing belt of the mixing station is completed, press enter to send the actual weight of the material to K value. Press enter to confirm. This is where the K value automatically generates a new K value, calibrated in the same way. Complete the calibration until the accumulated weight is equal to the actual weight.
混凝土攪拌機水的標定方法:水的標定方法簡單,因為系統采用水表,即高精度電子計量水表。將每公斤水表對應的脈沖量發送到第九路的K值是很重要的。是的,例如,我們的工廠使用Φ40套水等于每公斤22脈沖。因此,將第9個k值改為22,完成校準。第九個“時間”是水的百分比,零點是水的跟蹤系數。延遲就是加水的延遲。在使用道路時,六路不能連接皮帶秤。水路的自動DA值由道路輸出。
Concrete mixer water calibration method: water calibration method is simple, because the system uses water meter, that is, high-precision professional electronic metering water meter. It is important to send the pulse corresponding to the water meter per kilogram to the K value of the Ninth Circuit. Yes, for example, our factory uses Φ 40 sets of water equal to 22 pulses per kilogram. Therefore, change the 9th K value to 22 to complete the calibration. The Ninth "time" is the percentage of water, and the zero point is the tracking coefficient of water. Delay is the delay of adding water. When using the road, six ways cannot be connected to the belt scale. The automatic Da value of the waterway is output by the road.
以上是中科攪拌機廠家為大家介紹的相關內容,想要了解更多內容,歡迎訪問網站:http://www.bflrsn.cn
The above is the relevant content introduced by the mixer manufacturer of China Science and Technology Co., Ltd. for more information, please visit the website: http://www.bflrsn.cn